I have the 5k Level III Plan applied to Training Peaks with the Core Strength Plan overlaid. The integration is somewhat out of sync, I assume because of the longer microcycles.
I can make the adjustments myself, but I would like to clarify the Strength Plan progression: The plan begins with whole numbers, i.e. CS1, CS2, CS3; then with the nomenclature adding a decimal i.e. CS1.1, etc., until the plan completes with CS3.2.
I think the necessary adjustments are to move the strength workouts to synchronize with run hard days which would add some to days when there is a double workout which I think is fine since the second workout is a cross train session and could serve as a warmup to the strength session.
I’m not quite certain where to place the progressions, I assume they would occur immediately after each microcycle is announced in the run plan. Correct?
For subscribers using the workout library – it the sequencing of the workouts progression the same a described here?